Tauranga High Performing College Gymnasium

This state-of-the-art gymnasium complex is the latest step in the development of the successful Academic Colleges Group (ACG) school at Pyes Pa in Tauranga, giving the school a showpiece that is pivotal to its future growth.

This state-of-the-art gymnasium complex is the latest step in the development of the successful Academic Colleges Group (ACG) school at Pyes Pa in Tauranga, giving the school a showpiece that is pivotal to its future growth.

This state-of-the-art gymnasium complex is the latest step in the development of the successful Academic Colleges Group (ACG) school at Pyes Pa in Tauranga, giving the school a showpiece that is pivotal to its future growth.

Client

Academic Colleges Group (ACG)

Client

Academic Colleges Group (ACG)

Client

Academic Colleges Group (ACG)

Location

Pyes Pa,

Tauranga

Location

Pyes Pa,

Tauranga

Location

Pyes Pa,

Tauranga

Cost

Confidential

Cost

Confidential

Cost

Confidential

Completion

2017

Completion

2017

Completion

2017

Market

Education

Market

Education

Market

Education

The school wanted a high-performing building, and we delivered.

Babbage has worked with ACG from the outset of its Tauranga project as the group set about developing a school that will eventually cater for students from primary through to year 13.

The relationship began with our Architecture team, and supporting engineering services, planning and designing the initial 14-classroom development for junior pupils in 2014. The school concept called for modular design with flexibility to adjust classroom use as required.  

That brief continued with the gymnasium, which includes three classrooms that can be converted into a function space, while the gym itself can be used for school assemblies and other activities, and will be available for community use.

We were economical with the use of space with no trims. The design was highly durable, low-maintenance, and able to stand the test of time. The building was completed in May 2017, just 10 months after work started, despite the contractors losing five weeks to weather conditions.

The gym consists of a full-size court area for basketball, netball, volleyball and badminton, with bleachers on both sides rising from mezzanine level above changing rooms, plant rooms and storage areas.

The upper floors provide three classrooms that can be converted into a function space overlooking outdoor playing fields and the indoor court.

Inside the gym, each end wall is clad with perforated plywood panels, used for their acoustic properties and to conceal and protect louvers that allow natural ventilation. The double-glazing has a grey tint on the outer glass to reduce glare and solar gain.

The ceiling comprises fibre acoustic tiles and parallel areas of plywood panels, giving the gymnasium precise acoustics. The classrooms have acoustic walls that can be moved to create the function area.

Maximum use has been made of natural ventilation and light, and a building management system includes sensor-controlled lights, security and keyless entry.

 